Estimating, Costing and Valuation
SSC JE Syllabus
estimate, a glossary of
technical terms, analysis of rates, methods and unit of measurement, Items of
work – earthwork, Brick work (Modular & Traditional bricks), RCC work,
Shuttering, Timber work, Painting, Flooring, Plastering. Boundary wall, Brick
building, Water Tank, Septic tank, Bar bending schedule, Centre line method,
Mid-section formula, Trapezoidal formula, Simpson’s rule. Cost estimate of
Septic tank, flexible pavements, Tube well, isolates and combined footings,
Steel Truss, Piles and pile-caps. Valuation – Value and cost, scrap value, salvage
value, assessed value, sinking fund, depreciation and obsolescence, methods of
valuation.